one-time-verification=98384594-e099-4ef0-9054-6f9bd28eda36

The client is an engineering multinational group in tooling, materials technology, mining and construction. MYSIGMA’s task was to increase finished goods availability and reduce tied up capital. Product availability is a key success factor to defend their leading market position.
These changes resulted in dual benefits:
Based on a data driven pre-study, below changes were made: